September 16th 2019 

The engineering cadres at Alkufa Grand Mosque started in achieving the project of setting up a new Air Condition at Mosque of the Companion Sa'sa bin Suhan ( May Allah be pleased with him) and which due to be lasted for  15 days .

The supervisor engineer Muhammad Ali Alqassam talked to news center " Having studied the place and Having calculated the loads we decided to use concealed duct and it is going to be hidden to preserve the architectural style of the mosque",

"the system is consisted of six units with its accessories where each unit is 4 tons capacity and the distribution of air is going to be through ducts  is especially designed for properly covering the area as well as there are sensors of heat inside the room." He added.