Engineering Cadres accomplishes project of lightening outside wall

By times read : 99
Engineering Cadres accomplishes project of lightening outside wall

Completing to the project of the street surrounded the western side of the mosque, the Engineering Cadres conducted installing lightening poles as a part of services offered to the honorable visitors of the grand mosque.

The head of Engineering department, Eng. Haider Almusawee stressed that the Specialized Engineering Cadres accomplished the installation of 12m-lenghth poles in two directions, first one is the main road and the second one is the avenues of pedestrians.

He added that the poles are high technical features and they made according to needed specification of the lightening poles beside they are not consumed high power.   

  • Email to a friend Email to a friend
  • Print version Print version
  • Plain text Plain text

more from Engineering Department